Antrix/ISRO and EADS Astrium built commercial communication satellite launched successfully

December 6, 2010 —An advanced communication satellite HYLAS (Highly Adaptable Satellite) built by ISRO on a commercial basis in partnership with EADS-Astrium of Europe, was successfully launched today, November 27, 2010 at 00.09 hours Indian Standard Time (IST) by the European Ariane-5 V198 launch vehicle. The launch took place from the Guyana Space Centre at Kourou in French Guyana.

HYLAS35 minutes after its lift-off, HYLAS separated from Ariane-5 launch vehicle after reaching its intended Geosynchronous Transfer Orbit (GTO). ISRO's Master Control Facility (MCF) at Hassan in Karnataka successfully received radio signals transmitted by HYLAS and the satellite's health is normal.

HYLAS satellite developed for Avanti Communications, UK consists of ten high power transponders that use eight in Ka and two in Ku band frequencies. The satellite is designed to deliver high-speed broadband services through its spot beams over Europe. The satellite is expected to be operated from 33.5 deg. W longitude for European coverage.

The contract for building of satellite was won in the year 2006 after competing along other leading manufacturers of USA and Europe through the strategic alliance worked out between Antrix/ISRO and M/s. EADS Astrium of France. The alliance was formed to jointly develop communication satellites with ISRO platforms and Astrium payloads and market them internationally.

Astrium had the responsibility for overall program management and delivery of the communications payload and Antrix/ISRO provided the satellite bus and also performed the satellite integration and testing at ISRO's facility in Bangalore. HYLAS satellite weighing 2541 kg at lift-off is the heaviest satellite built by ISRO for I-2K bus capable of operating for over 15 years mission life as demanded by the customer. The satellite's solar panels generate a maximum of about 3200 Watts of power.

Antrix/ISRO is also responsible for the post launch operations of HYLAS, which are being conducted from the Master Control Facility, Hassan. The operations include firing of the satellite's Liquid Apogee Motor (LAM) in three phases to place the satellite in geostationary orbit. The first firing of LAM is scheduled for the early hours of November 28, 2010.

Featured Video
Jobs
Principal Engineer for Autodesk at San Francisco, California
Machine Learning Engineer 3D Geometry/ Multi-Modal for Autodesk at San Francisco, California
Senior Principal Software Engineer for Autodesk at San Francisco, California
Mechanical Engineer 3 for Lam Research at Fremont, California
Manufacturing Test Engineer for Google at Prague, Czechia, Czech Republic
Mechanical Test Engineer, Platforms Infrastructure for Google at Mountain View, California
Upcoming Events
Dimensions User Conference 2024 at The Venetian Resort Las Vegas NV - Nov 11 - 13, 2024
Greenbuild 2024 at Pennsylvania Convention Center Philadelphia PA - Nov 12 - 15, 2024
Digital Construction North (DCN) 2024 at Manchester Central. Manchester United Kingdom - Nov 13, 2024
Digital Twins 2024 at the Gaylord National Resort & Convention Center in, MD. National Harbor MD - Dec 9 - 11, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise