Westinghouse Produces 1,000th Additive Manufacturing Component for VVER-440 Fuel

AM reduces production costs and lead time while achieving the highest industry safety standards

CRANBERRY TOWNSHIP, Pa. — (BUSINESS WIRE) — March 20, 2024Westinghouse Electric Company recently reached a significant milestone by manufacturing its 1,000th fuel flow plate using Additive Manufacturing (AM). It represents an industry achievement as the first ever safety-related AM components to enter serial production.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240320135503/en/

A fuel assembly component produced through additive manufacturing. (Photo: Business Wire)

A fuel assembly component produced through additive manufacturing. (Photo: Business Wire)

The AM flow plates are installed in VVER-440 fuel assemblies, enabling a redesign of the assemblies’ bottom part which results in a more robust performance.

“This achievement showcases the development of additive manufacturing from prototyping to full-scale production, generating tangible value for our customers,” said Lou Martínez Sancho, Westinghouse Chief Technology Officer and Executive Vice President, R&D and Innovation. “This marks another Westinghouse pioneering achievement in AM Technology holding the commitment to strengthen safety, efficiency, sustainability and energy security.”

This milestone is a continuation of Westinghouse’s leadership in deploying AM in the nuclear industry to achieve cost and lead-time reductions and enable cutting-edge solutions for energy generation. In 2015, the company conducted the first ever material irradiation study of AM nuclear components. In 2020, Westinghouse installed the first ever safety-related AM component, a Thimble Plugging Device, into an operating commercial reactor.

Westinghouse Electric Company is shaping the future of carbon-free energy by providing safe, innovative nuclear and other clean power technologies and services globally. Westinghouse supplied the world’s first commercial pressurized water reactor in 1957 and the company’s technology is the basis for nearly one-half of the world's operating nuclear plants. Over 135 years of innovation make Westinghouse the preferred partner for advanced technologies covering the complete nuclear energy life cycle. For more information, visit www.westinghousenuclear.com and follow us on Facebook, LinkedIn, and X.



Contact:

media@westinghouse.com

Featured Video
Jobs
Principal Engineer for Autodesk at San Francisco, California
Senior Principal Software Engineer for Autodesk at San Francisco, California
Machine Learning Engineer 3D Geometry/ Multi-Modal for Autodesk at San Francisco, California
Mechanical Manufacturing Engineering Manager for Google at Sunnyvale, California
Equipment Engineer, Raxium for Google at Fremont, California
Senior Principal Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Upcoming Events
Dimensions User Conference 2024 at The Venetian Resort Las Vegas NV - Nov 11 - 13, 2024
Greenbuild 2024 at Pennsylvania Convention Center Philadelphia PA - Nov 12 - 15, 2024
Digital Construction North (DCN) 2024 at Manchester Central. Manchester United Kingdom - Nov 13, 2024
Digital Twins 2024 at the Gaylord National Resort & Convention Center in, MD. National Harbor MD - Dec 9 - 11, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise