Metsä Wood: Building D(emountable) - Fast Construction With Hybrid Structures

HELSINKI, March 24, 2020 — (PRNewswire) — The architectural office cepezed from the Netherlands wanted to build a four-storey office building that could be moved to another location, if needed. The end-result, Building D(emountable), is a hybrid structure that combines a steel structure with wooden elements and a glass façade. Using Kerto® LVL (laminated veneer lumber) elements made the project more sustainable, and the lightweight elements were extremely fast to install.

The wooden floor elements were manufactured at De Groot Vroomshoop's factory. Lightweight wood elements were easy to handle in the narrow streets of Delft's city centre. The assembly of the load-bearing structure was really quick.

"I was impressed by the speed in assembly," says cepezed founder and architect Jan Pesman. "The whole stability structure was put together in only three weeks. Kerto LVL elements were practical and really suitable for prefabricated, industrial construction methods."

The connections were designed to remain reversible, meaning that the building can be easily dismantled. Using  wooden elements also means that the whole process can be reversed:

"You can also dismantle the building and rebuild it somewhere else. If needed or wanted, you can just move this building wherever you want," says structural engineer Elise van Westenbrugge-Bilardie from IMd consultative engineers.

Fast, light and green with Kerto LVL

The Building D(emountable) is an elegant combination of steel, wood and glass. Using prefabricated elements was a good prototype project for cepezed for future hybrid building projects.

"One of the goals was to make the building as light as possible," explains van Westenbrugge-Bilardie. "cepezed gave us the idea to use wooden elements with the design. We also wanted to use small elements, so the parts can be easily be transported to site and combined there."

"We are definitely looking forward using Kerto LVL elements again," says Pesman.

Learn more about the hybrid structure of the Building D(emountable).

The Hybrid City Challenge: €10,000 to the most innovative hybrid design

Metsä Wood's Hybrid City Challenge is calling on building engineers, designers and construction companies to join in an initiative to discover the world's best solutions for more efficient, sustainable, modular and practical building. The task is to design a solution fit for hybrid construction, using Kerto LVL as the main material. The closing date for entries is 31 May 2020, and the most innovative solution will be awarded €10,000. Second and third places will be awarded €5,000 each.

To learn more about the Hybrid City Challenge and to participate, go to planb.metsawood.com.

Images: https://databank.metsagroup.com/l/5b9MJqRRTQfb

For more information, please contact:
Viivi Kylämä
Marketing Manager
Metsä Wood
tel. +358-40-820-9850
Email Contact

Kirk Nichols
VP Sales
Americas
Metsä Wood USA
mobile: +(404)-861-1098
  Email Contact

For press information in UK, please contact:
Matt Trace
Director
Defero Communications
tel. +07828663988
Email Contact

This information was brought to you by Cision http://news.cision.com

https://news.cision.com/metsa-wood/r/metsa-wood--building-d-emountable----fast-construction-with-hybrid-structures,c3066777

The following files are available for download:

 

Contact:
Company Name: Metsä Wood


Featured Video
Jobs
Senior Principal Software Engineer for Autodesk at San Francisco, California
Principal Engineer for Autodesk at San Francisco, California
Machine Learning Engineer 3D Geometry/ Multi-Modal for Autodesk at San Francisco, California
GIS Specialist for Washington State Department of Natural Resources at Olympia, Washington
Mechanical Engineer 3 for Lam Research at Fremont, California
Manufacturing Test Engineer for Google at Prague, Czechia, Czech Republic
Upcoming Events
Dimensions User Conference 2024 at The Venetian Resort Las Vegas NV - Nov 11 - 13, 2024
Greenbuild 2024 at Pennsylvania Convention Center Philadelphia PA - Nov 12 - 15, 2024
Digital Construction North (DCN) 2024 at Manchester Central. Manchester United Kingdom - Nov 13, 2024
Digital Twins 2024 at the Gaylord National Resort & Convention Center in, MD. National Harbor MD - Dec 9 - 11, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise