Arup Celebrates Start of Construction for Phase 3 of MASS MoCA

Structural renovations and seismic compliance engineering will enable 100-year old existing building to support expansive new gallery spaces with open floor plates and natural lighting

BOSTON, Sept. 24, 2015 — (PRNewswire) — Arup, a multidisciplinary engineering and consulting firm with a reputation for delivering innovative and sustainable designs, announced today the commencement of construction for renovations at the Massachusetts Museum of Contemporary Art (MASS MoCA). Arup is the structural engineer for the transformation of a 120,000 SF industrial mill building into a world-class contemporary art museum. Building 6 is the third phase of a 25-year museum master plan, and will make MASS MoCA the largest contemporary art museum in the U.S. Working directly for Bruner/Cott Architects and Planners, Arup is developing structural solutions that serve to implement the architect's vision to preserve and enhance the building's natural assets of openness, light, and texture, while bringing the 100-year old building into modern structural compliance by resolving inherent lateral deficiencies.

Massachusetts Museum of Contemporary Art, Gallery. Rendering copyright Bruner/Cott & Associates

The existing warehouse building was originally constructed using a variety of materials, including brick, wood, reinforced concrete, and cast-iron. To highlight the integrity of the historical building features while bringing the structure into compliance with modern seismic lateral upgrade standards, Arup responded with structural solutions that solve aesthetic, programmatic, and functional needs. It designed steel-braced frames and foundations that integrate easily with existing wood features. As the architects sought ways in which they could open up gallery spaces and expose building elements, Arup installed structural steel to create expanded openings and column free zones by transferring large weights to the reinforced foundation. Keeping some of the steel transfers exposed is a design element consistent with other buildings on the campus, and creates an industrial aesthetic that is simultaneously rudimentary and graceful.

"Arup is creative and respectful of the design work we have established on the museum campus. Their thinking enabled some meaningful and dynamic interventions to make this new gallery space. Together, we found ways to double and triple-use the structural retrofits to carry gravity, seismic, or winds loads in a way that will also be a meaningful part of the finished space," said Jason Forney, principal at Bruner/Cott. "They were able to balance design, cost and schedule considerations, and they navigated the new Massachusetts existing building code effectively."

Arup performed on-site investigation of the structure and existing building system to determine which elements could be retained safely, economically, and sustainably. With an eye towards forthcoming exhibit needs and the potential for additional load bearing components, Arup's structural design is flexible to accommodate future improvements. Early foundation phase work, while unglamorously hidden in the basement crawlspace level, was prudently accepted by the owner and methodically implemented by Waterman Excavating to serve as key elements enabling the installation of follow-on lateral upgrades and facilitation of future MEP work by creating a far safer usable basement zone.

"Existing building renovations are a particular strength for Arup's structural team," said Jimmy Su, associate with Arup. "The complexities and challenges in this building type require a blend of engineering artistry, with pragmatic approaches to structural integrity, safety, and practicality. We thoroughly enjoy the intersection of these elements, and are thrilled to be able to apply them to the renovation of this Mass MoCA building." 

Additional similar historic existing building renovation projects include the Cutter and Ziskind Houses at Smith College, the Smith Campus Center at Harvard University, and the Bruce C. Bolling Building in Boston's Roxbury neighborhood.

About Arup
Arup is the creative force at the heart of many of the world's most prominent projects in the built environment and across industry. Its engineers and consultants deliver innovative projects across the world. Arup opened its first US office 25 years ago, and now employs 1,000 in the Americas. The firm was founded in 1946 with an enduring set of values that fosters a distinctive culture, intellectual independence and collaborative approach. The people at Arup are driven to find a better way to deliver better solutions for their clients. ( www.arup.com)

For further information please contact:

Rebecca Maloney, LEED AP, CPSM
Arup
e Email Contact
m +1 617 412-6632

Jennifer Shelby, CPSM
Rhino PR
e Email Contact
+1 508 685 0763

Arup, a multidisciplinary engineering and consulting firm with a reputation for delivering innovative and sustainable designs.

 

Photo - http://photos.prnewswire.com/prnh/20150923/270011
Logo - http://photos.prnewswire.com/prnh/20130826/MM69714LOGO

To view the original version on PR Newswire, visit: http://www.prnewswire.com/news-releases/arup-celebrates-start-of-construction-for-phase-3-of-mass-moca-300148105.html

SOURCE Arup

Contact:
Arup
Massachusetts Museum of Contemporary Art
Web: http://www.arup.com

Featured Video
Jobs
Senior Principal Software Engineer for Autodesk at San Francisco, California
Principal Engineer for Autodesk at San Francisco, California
Machine Learning Engineer 3D Geometry/ Multi-Modal for Autodesk at San Francisco, California
Mechanical Engineer 3 for Lam Research at Fremont, California
Business Technology Analyst for Surface Water Management at Everett, Washington
Mechanical Engineer 2 for Lam Research at Fremont, California
Upcoming Events
Dimensions User Conference 2024 at The Venetian Resort Las Vegas NV - Nov 11 - 13, 2024
Greenbuild 2024 at Pennsylvania Convention Center Philadelphia PA - Nov 12 - 15, 2024
Digital Construction North (DCN) 2024 at Manchester Central. Manchester United Kingdom - Nov 13, 2024
Digital Twins 2024 at the Gaylord National Resort & Convention Center in, MD. National Harbor MD - Dec 9 - 11, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise