First Boeing 787-9 Dreamliner Begins Final Assembly

Newest 787 complements, extends the super-efficient family

EVERETT, Wash., June 2, 2013 — (PRNewswire) —  Boeing [NYSE: BA] has begun final assembly of the first 787-9 Dreamliner. The newest member of the 787 family began taking shape on schedule May 30 in Everett, Wash., when Boeing started joining large sections of the super-efficient jet.

"From the start, the entire 787-9 team has focused relentlessly on execution so that we fulfill the commitments to our customers," said Mark Jenks, vice president, 787 Airplane Development, Boeing Commercial Airplanes. "Integrating the 787-9 into our production system on time is another clear sign that we are well prepared and well positioned for the work ahead."

Boeing's global partners delivered the first 787-9 sections to final assembly on or ahead of schedule, and strong progress continues beyond, with major assembly under way on the other flight-test airplanes. "The dedication, quality and skill of our partners are helping drive our disciplined performance," said Jenks.

Boeing will build the first three 787-9s on its Temporary Surge Line in Everett to allow for smoother integration of the 787-9 into the production system while continuing to ramp up production across the 787 program.

The 787-9 will complement and extend the 787 family, offering airlines the ability to grow routes opened with the 787-8. With the fuselage stretched by 20 feet (6 meters), the 787-9 will carry 40 more passengers an additional 300 nautical miles (555 kilometers) while using 20 percent less fuel than similarly sized airplanes. The 787-9 leverages the visionary design of the 787-8, offering the features passengers prefer such as large, dimmable windows, large stow bins, modern LED lighting, higher humidity, a lower cabin altitude, cleaner air and a smoother ride.

The vertical stabilizer on this 787-9 reflects the new Boeing Commercial Airplanes livery, a refreshed look for the Boeing family of airplanes that started with the 747-8 and evolved with the 737 MAX. Many features of the livery on the original 787 are reflected in the new design. The prominent number designator on the tail helps distinguish various models within the same product family.

First flight of the 787-9 is scheduled for the second half of 2013, with first delivery to launch customer Air New Zealand set for early 2014. 20 customers around the world have ordered 355 787-9s, accounting for 40 percent of all 787 orders.

Contact:
Julie O'Donnell
Boeing Commercial Airplanes Communications
julie.o'donnell@boeing.com

More information: http://www.boeing.com/boeing/commercial/787family/787-9prod.page

Photo and caption are available here: http://boeing.mediaroom.com

SOURCE Boeing

Contact:
Boeing
Web: http://www.boeing.com

Featured Video
Latest Blog Posts
Sanjay GangalAECCafe Today
by Sanjay Gangal
AEC Industry Predictions for 2025 — vGIS
Sanjay GangalIndustry Predictions
by Sanjay Gangal
AEC Industry Predictions for 2025 — QeCAD
Jobs
Business Development Manager for Berntsen International, Inc. at Madison, Wisconsin
Upcoming Events
Consumer Electronics Show 2025 - CES 2025 at Las Vegas Convention Center Las Vegas NV - Jan 7 - 10, 2025
Commercial UAV Expo 2025 at Amsterdam Netherlands - Apr 8 - 10, 2025
Commercial UAV Expo 2025 at RAI Amsterdam Amsterdam Netherlands - Apr 8 - 11, 2025
Geospatial World Forum 2025 at Madrid Marriott Auditorium Madrid Spain - Apr 22 - 25, 2025



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise