Pointools Models Shape Restoration of Historic Theatre

September 14, 2011 -- Complex laser scanned computer models, created using software from Pointools, are helping architects design the most complete recreation of an English renaissance indoor theatre ever attempted. The indoor Jacobean theatre, the shell of which already exists on the Shakespeare’s Globe site in London, will be restored to provide a brand new theatre space that will seat around 320 people, with two tiers of galleried seating and an authentic pit seating area.

‘We commissioned a laser scan survey at the outset of the construction venture to enable the project management team to establish the exact dimensions of the space and to discover any hidden issues that may affect the design and build process of the new theatre,” commented Paul Williams, Technical Manager at the Globe Theatre. “The Pointools models will, primarily, be used by project architect – Allies and Morrison – to inform their design and quantify the interior dimensions of the space that the indoor theatre will occupy.”

The original vision for Shakespeare’s Globe Theatre extended beyond the iconic ‘wooden-O’ structure that already exists. When it opened in 1997 (after more than 27 years’ of planning and four years’ of construction) the indoor Jacobean theatre was left as a shell – divided and partitioned into rooms for educational workshops and rehearsals.

APR Services, the original survey firm to scan the Globe Theatre and a 3D laser scanning veteran, was again contracted to survey the indoor Jacobean theatre space. Using a Faro 3D laser scanner, APR captured around 3 billion millimetre-accurate measurements to detail the inside and outside of the complex building shell that included false doors and steps. Then using Pointools’ point cloud software, the billions of individual measurement points were processed to create a visually stunning, highly accurate, 3D replica of the existing structure and space for use in the design and construction process.

Tony Rogers of APR Services commented, “We completed the original survey of the main theatre at the Globe a few years back so it was important that we could tie the indoor Jacobean theatre data to the existing models.” He continued, “Using Pointools software we were able to create very accurate 3D replicas of the theatre to support architectural designs and decision making. It‘s hoped that these models will support a faithful recreation of the indoor Jacobean theatre within the constraints of modern rules and regulations.”

CONTACTS:

Email Contact, www.pointools.com, www.twitter.com/pointools

Featured Video
Jobs
Principal Engineer for Autodesk at San Francisco, California
Machine Learning Engineer 3D Geometry/ Multi-Modal for Autodesk at San Francisco, California
Senior Principal Software Engineer for Autodesk at San Francisco, California
Mechanical Test Engineer, Platforms Infrastructure for Google at Mountain View, California
Mechanical Manufacturing Engineering Manager for Google at Sunnyvale, California
Equipment Engineer, Raxium for Google at Fremont, California
Upcoming Events
World Architecture Festival 2024 at Marina Bay Sands Singapore - Nov 6 - 8, 2024
Dimensions User Conference 2024 at The Venetian Resort Las Vegas NV - Nov 11 - 13, 2024
Greenbuild 2024 at Pennsylvania Convention Center Philadelphia PA - Nov 12 - 15, 2024
Digital Construction North (DCN) 2024 at Manchester Central. Manchester United Kingdom - Nov 13, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise