With no standard data format or system for storing, accessing, and maintaining information on 52 power plants, nearly 900 grid stations, and 430,000 power lines, finding trustworthy engineering content was a time-consuming challenge for the staff at the Saudi Electricity Company (SEC). “They spent days looking for and vetting information, which hurt productivity, increased costs, and impaired our emergency preparedness, stated Abdulaziz Al-Hamed, Engineering Applications Group Leader at SEC. ”So we made it a strategic priority to manage our kingdom-wide physical assets more effectively – which required implementing a robust engineering content management system that enables access and integrity.