All Categories : Case Studies Bookmark and Share

Title : HDR Tappan Zee Hudson River Crossing: The New New York Bridge, Bentley Systems
Company : Bentley Systems
Date : 30-Mar-2016
Rating :
Downloads : 113



If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

HDR was awarded the contract to design and build the new New York Bridge – which will replace the traffic-jammed Tappan Zee Bridge – on an aggressive schedule. In addition to crossing the Hudson River at one of its widest points, the design included twin tower cable-stayed main spans with 1,200-foot center spans, four traffic lanes, shoulders and emergency lanes, electronic tolling facilities, a shared-use path, and space for future mass transit. The owners also required an as-designed model and a complete, as-constructed database of assets derived from and tied to a 3D model
User Reviews More Reviews Review This File
Featured Video
Latest Blog Posts
Sanjay GangalAECCafe Today
by Sanjay Gangal
AEC Industry Predictions for 2025 — vGIS
Sanjay GangalIndustry Predictions
by Sanjay Gangal
AEC Industry Predictions for 2025 — QeCAD
Jobs
Business Development Manager for Berntsen International, Inc. at Madison, Wisconsin
Upcoming Events
Consumer Electronics Show 2025 - CES 2025 at Las Vegas Convention Center Las Vegas NV - Jan 7 - 10, 2025
Commercial UAV Expo 2025 at Amsterdam Netherlands - Apr 8 - 10, 2025
Commercial UAV Expo 2025 at RAI Amsterdam Amsterdam Netherlands - Apr 8 - 11, 2025
Geospatial World Forum 2025 at Madrid Marriott Auditorium Madrid Spain - Apr 22 - 25, 2025



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise