All Categories : Case Studies Bookmark and Share

Title : China Nerin Engineering Improves Efficiency by 20 Percent with Bentley’s 3D Design Technology
Company : Bentley Systems
File Name : 9494_CS_ChinaNerin_LTR_HR_0213_F.pdf
Size : 1272839
Type : application/pdf
Date : 28-Feb-2013
Rating :
Downloads : 261



If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

$1.1 Billion Copper Smelting Upgrade
China Nerin Engineering Co., Ltd. (Nerin), a leader among engineering companies serving China’s nonferrous metal industry, was contracted to design and deliver the $1.1 billion Tongling Copper Smelting Project within 36 months. Owned by Tongling Nonferrous Metals Group Co. Ltd., the advancedtechnology smelter is located in Tongling City, Anhui Province, China. To achieve the aggressive schedule, Nerin adopted Bentley’s 3D plant design technology including Bentley PlantSpace design applications and ProjectWise project collaboration and information management software. Bentley solutions improved design efficiency by nearly 20 percent, enabling Nerin to deliver the large-scale project three months ahead of schedule, while optimized plant configuration reduced the plant size, saving an estimated 10 percent in construction costs.
User Reviews More Reviews Review This File
Featured Video
Jobs
Senior Principal Software Engineer for Autodesk at San Francisco, California
Principal Engineer for Autodesk at San Francisco, California
Machine Learning Engineer 3D Geometry/ Multi-Modal for Autodesk at San Francisco, California
Mechanical Manufacturing Engineering Manager for Google at Sunnyvale, California
Senior Principal Mechanical Engineer for General Dynamics Mission Systems at Canonsburg, Pennsylvania
Mechanical Test Engineer, Platforms Infrastructure for Google at Mountain View, California
Upcoming Events
World Architecture Festival 2024 at Marina Bay Sands Singapore - Nov 6 - 8, 2024
Dimensions User Conference 2024 at The Venetian Resort Las Vegas NV - Nov 11 - 13, 2024
Greenbuild 2024 at Pennsylvania Convention Center Philadelphia PA - Nov 12 - 15, 2024
Digital Construction North (DCN) 2024 at Manchester Central. Manchester United Kingdom - Nov 13, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise